New BOM - Bill Of Material

How to Create the Bill of Materials for a Newly Created Product

To access the editing of any part of the product, select the three dots in the top right corner, choose Edit, and click on Bill of Materials

As this is a newly added product, you'll find only the TO BE ASSIGNED column and the respective commands   and  

The elements governing the entire production process are described in the Phases. Therefore, begin by obtaining a comprehensive overview of all the phases and detailing each of their components. 

Click on “Add Phase”     

After saving the phase, it will appear in the first free Kanban column on the page. You can then proceed by inserting all the other phases or start detailing the newly added phase. Click on to add the first product that comprises the phase. 

 

Start typing code or name of the product and enter it -> Autocomplete List: As you type, a list containing the relevant text will appear, then:

  • Enter the Quantity required for the phase.
  • Press Ok to confirm.

Entering products with their BOM from a list:

Similar to the mass insertion of products, you can utilize the same mechanism by clicking on ADD PRODUCT LIST (see how to add products from a list).

At this point, you can add additional phases or other products as needed.