- Knowledge Base Center
- iProd IoT Tablet Installation
-
FAQs
-
Quick Start
-
iProd Cloud Features
- Document Templates
- Introduction to iProd Cloud
- Common Procedures
- Authentication, access, registration
- Home Page
- Setting
- Customers and Suppliers
- Phases
- Products and Services
- Marketplace
- e-commerce with iProd. The shopping cart
- Sales Order Execution
- Common Operations
- Order Execution
- Planning
- ERP Documents
- Traceability
- Invoicing
- ESG - Greenhouse gas (GHG) emission reporting
-
iProd Cloud Offering
-
iProd IoT Tablet Installation
-
iProdSync
-
Release Notes
-
iProd IoT Engine
-
iProd App Store
Mechanical Installation of the iProd IoT Tablet
Installation on the Machine Using Screws or Magnets
The iProd tablet should be securely mounted on the machine being monitored, ideally near the operator's station to improve ergonomics.The tablet is installed using the adjustable bracket included in the package.
The bracket can be attached either directly to the machine or to a dedicated support (not included) using 4 screws (not included) or by ordering the magnetic kit separately. This kit consists of 4 high-strength magnets that attach to the adjustable bracket via the provided mounting holes.